Budget
$1.8 million
Scope of Work
The professional services provided by Sander Engineering Corporation will include preparation of construction drawings, contract, and technical specifications for the proposed odor control units. Civil site work will be designed, including a slab-on grade concrete foundation, grading, potable water connection, mechanical piping, and electrical design. Sander Engineering Corporation will coordinate with the equipment manufacturer to incorporate necessary technical details and specifications of the odor control equipment.
Subdivisions, Areas, or Streets Impacted
Smith Lane and Butler Street
Project Status as of May 2022
The design phase of the project is currently 60% complete.