Asphalt Street Road Reconstruction Package

Budget

$4.1 million 

Scope of Work

The purpose of this project is to perform road base repairs, asphalt resurfacing, and/or full depth reconstruction as part of an annual infrastructure reinvestment program. This project includes a base bid of Seminole Drive, Glen Cove, and Mary Lane. Glen Cove has a bid alternate No.1A for using traditional construction methods and a bid alternate No.1B add/deduct for using the LithTec method. Other alternate add-ons include reconstruction of Cedar Avenue, Moody Avenue, and Tallow Forest.

Subdivisions, Areas, or Streets Impacted

Glen Cove Subdivision, Glen Cove Blvd., Seminole Drive, Mary Lane, Tallow Forrest, Moody Ave., and Cedar Ave

Crews will be milling approximately nine inches of asphalt down to the sub-base material on Moody Ave. The sub-base will be stabilized, and the base will be reconstructed with six inches of black base. There will be 1-1/2 inches of asphalt level-up and then 1-1/2 inches of asphalt surface.

Council has awarded the construction contract to Texas Materials Group, Inc. on May 24, 2022 with Notice to Proceed issued on July 11, 2022. Construction is expected to be complete in January 2023.

Project Manager Contact Information

Scott Tuma
Phone: 281-554-1431
Email Scott Tuma

Aerial Map of the Asphalt Street Road Reconstruction with Project Boundaries.

Aerial Map of the Asphalt Street Road Reconstruction with Project Boundaries.